how to calculate 1 cubic meter gives output in stone crusher


nakayama stone crusher

how to calculate 1 cubic meter gives output in stone crusher; marketing strategies of stone crusher; grinding stone wheels wheel malaysia; stone crushers andhra pradesh nalgonda; stone cone crusher machine qatar nigeria; list of stone crushingpanies india; project report on masionary stone crusher; manufacturers and suppliers of rock, gravel ... Our Gravel calculator allows you to estimate the quantity of gravel required for your project. It provides the measurement of the excavation and it returns the area and volume of the excavation and weight of the gravel required. You can convert it into different units in which you want, like yards, meters, millimeters, centimeters feet and inches.

Need help sq ft to tons - OnlineConversion Forums

6500 square foot * (1.5 inches / 12) foot = 812.5 cubic foot ... I would like to find how many tons of crusher run I would need for my drive 10' x 450' x 3" any help in this area would be greatly appreciated. And how you figure it. ... x 2 should give you a close amount. Making sure all units are the same. 2" is about 1… 3 feet are in 1 yard; 27 cubic feet are in 1 cubic yard (3 feet x 3 feet x 3 feet) 46,656 cubic inches are in 1 cubic yard (36 inches x 36 inches x 36 inches) Now that you understand the basics, you can skip to the cubic yard calculator, or follow along with a sample project …

how to calculate crusher aggregate in to cubic meter

crushed gravel weight per cubic meter crusher 100 mesh . May 5, 2014 ... Standard Weights for Crushed Rock Per Meter. The weight of Pit run gravel follows at 1.25 tons per cubic meter, How to Crush Stone. Get Price Calculating an accurate estimate of how much gravel or aggregate you need for a driveway is simple with our gravel calculator. All you need to know is the desired length and width of the driveway, along with what gravel depth you need. ... If you find your product cheaper somewhere else, give us a call on 0330 058 5068 and press option 1!

Calculate How Much Driveway Gravel You Need | DoItYourself.com

To complete the example, 81 cubic feet divided by 27 comes out to 3 cubic yards, since 81/27 = 3. Thus, you will 3 cubic yards of gravel for the project. Tip: In exactly the same way that 3 is the number of non-cubic feet that make up 1 non-cubic yard, and any amount of feet divided by 3 will give you a measurement in yards, 27 is the magic ... Materials Calculator. Measure twice, order once. How to run a quick calculation. Simply enter the width, length and depth that you need and hit "calculate." Contact us with your estimate to get a quote on your project. *For all landscaping projects we recommend a minimum depth of 2-3 inches of material.

Blasting and Explosives Quick Reference Guide 2010

These rules provide a first estimate in the absence of any better data. Blast hole diameter in mm ≤ 15 x Bench height (BH) in metres Bench height (BH) in metres ≥ (Blast hole diameter (D) in mm)/15 Burden (B) = (25 to 40) x (D) Spacing (S) = 1.15 x B (This gives an equilateral pattern) Subdrill = (3 to 15) x D Charge length (C) ≥ 20 D Stemming ≥ 20 x D or (0.7 - 1.2) x B Divide Cubic Feet by 27 = Cubic Yards. Multiply Cubic Yards by 1.5 = Tons Needed. For figuring round areas, use the following example: 24 ft round pool – 4″ deep. Start with 1/2 the radius: 144 x (3.14) x depth divided by 27 x unit weight. x 3.14 = 452.16. x 1.5 = 8.30 tons. * Depth Calculations.

How to Calculate Hardcore Quantities | Sciencing

A ton is equal to 2,000 pounds. To calculate the amount of aggregate you need for a project, make sure you know the length, width and depth in feet of your project. Multiply these three values to get the volume in cubic feet, divide it by 27 to get cubic yards and finally, multiply your result by 1.5 to get how many tonnes you'll need. b) 1.5m to 3m. c) 3m to 4.5m. 2. Excavation in earthwork for hard soil/ hard rock for a lead distance of 1km for following depths: a) Up to 1.5m. b) 1.5m to 3m. c) 3m to 4.5m. In the above examples of excavation, more number of descriptions are possible with different lead distance and type of soil.

Gravel Calculator - Stone Warehouse

This gravel calculator provides a rough guide to how much gravel you will need to cover a specific area (such as a driveway). The depth will depend on the size of the material as well as its intended use. To calculate an area, first choose the unit of measurement on the left hand side, the default is kilograms and metres but this can be changed ... To make 1 cubic metre of 15 Mpa concrete you will need to mix 5 1/2 bags of cement with 0,75 cubic metres of sand and 0,75 cubic metres of stone. 25 Mpa This is a medium strength concrete and is suitable for reinforced foundations, light-duty house floors, patio …

Volume Calculator - SoilWorx

Calculation Formulas Square or Rectangle (Length x Width x Depth) The area of a square or rectangular garden is easy to calculate. Simply multiply the length by the width by the depth or use our simple volume calculator. Circular π r 2 x Depth Circular areas are also easy to calculate. Simply multiply 3.1415 (π) by the radius, by the radius again, by the depth or use our simple volume ... To measure the driveway in cubic feet, multiply the length by width by depth. For cubic yards, divide the total cubic feet by 27. Because one cubic yard of gravel is equal to 1.13 tons, you can multiply your total cubic yards by 1.13 to convert this measurement to tons. Working With Gravel. When working with gravel for a driveway, calculate the ...

What is crusher dust - Answers

Stone crusher is a very general concept that encompasses a very wide range of crushers: jaw crusher, cone crusher, impact crusher. Different crushers have different features. How much cement and sand(kg) do i need to make 1.35 cubic . Jul 30, 2009The sand is sold in m3 but u are going to need stone as well so half a cubic m of sand and half stone will give u 1m3 but don't think u can buy .35m3 or 16bags of concrete mix will give u .35m3 as far as the cement goes it depends on the strength of the concrete but the back of the cement bag will give u how much to use ...

Length, Width & Height to Volume Calculator

The following conversion factors in cubic metres (m³) are used to convert the calculated volume into different volumetric units: cubic nanometre (cu nm) – 1 x 10-27 m³; cubic micrometre (cu µm) – 1 x 10-18 m³; cubic millimetre (cu mm) – 1 x 10-9 m³; cubic centimetre (cu cm) – 1 x 10-6 m³; millilitre (mL) – 1 … This series of concrete calculators has been developed to help you plan your project. You can calculate how much concrete, cement, sand, mortar or render you will need. For each calculation you will have to know the dimensions of your object. The calculator will perform the sums for you - where relevant it will add a small percentage for the wastage that inevitably happens when mixing & using ...

Calculate and estimate Floor Screed Quantities

Screed prices for this calculator are averaged out between 25mm and 75mm thicknesses, which will give a slight bias either side of the mean price. Floor screeds are an in-situ flooring of cement mortar laid to an accurate flat surface by screeding, or by self-levelling. 3 feet are in 1 yard; 27 cubic feet are in 1 cubic yard (3 feet x 3 feet x 3 feet) 46,656 cubic inches are in 1 cubic yard (36 inches x 36 inches x 36 inches) Now that you understand the basics, you can skip to the cubic yard calculator, or follow along with a sample project …

Gravel Calculator – Square Footage Area

Our Gravel calculator allows you to estimate the quantity of gravel required for your project. It provides the measurement of the excavation and it returns the area and volume of the excavation and weight of the gravel required. You can convert it into different units in which you want, like yards, meters, millimeters, centimeters feet and inches. b) 1.5m to 3m. c) 3m to 4.5m. 2. Excavation in earthwork for hard soil/ hard rock for a lead distance of 1km for following depths: a) Up to 1.5m. b) 1.5m to 3m. c) 3m to 4.5m. In the above examples of excavation, more number of descriptions are possible with different lead distance and type of soil.

How to Estimate Gravel Needs for a Driveway | Home Guides ...

Dec 15, 2018· Correctly used, gravel makes a solid, long-lasting finish for a dirt driveway. For most purposes, a depth of 4 inches is recommended for a new installation. Measure for your volume of … Dec 11, 2012· crushed rock calculator cubic metre to ton – Crusher South Africa. Volume to Weight conversions for Stone, … 1.602 gram per (cubic centimeter) or 0.926 ounce … equal to 1137.1 kilogram per cubic meter … Jaw Crusher. Impact Crusher… »More detailed

Soil Calculator - Soils Aint Soils

4.5 Trailer loads = 3 cubic metres. If you are not sure how much soil you will need for the job, using big strides, pace out the length and the width of the area in question. When you have this multiply the length by the width and multiply by the required depth. This is not the exact measurement but it will give you a guide to the quantity you ... If the hourly tonnage to be crushed divided by the square of the required gape in inches is less than 0.115, use a jaw crusher; otherwise use a gyratory. (If the required capacity in metric TPH is less than 162 times the square of the gape in metres, use a jaw crusher.) Source: Arthur Taggart. Crushing in Mineral Processing.

Conversion Guide – Centenary Landscaping Supplies

You will notice however that not all of our materials are sold by weight, our lighter materials such as bark, mulch and compost are still sold by the metre. When viewing a product online, such as a decorative pebble, soil, or sand you will notice a few numbers that may look similar to this – 1.5 Tonne = 1 Cubic Metre. Feb 27, 2018· You need to know the density of stone. Formula: Weight = Volume * Density 1 m3 of stone = 2.2 tonne (for density = 2200 kg/m3) Source of information and the simple converter - Convert m3 to tonne (cubic meter to metric ton)

Gravel Calculator - calculate how much gravel you need

Use this online gravel calculator to estimate how much gravel in volume (cubic ft, cubic yards, or cubic meters) or weight (tons & pounds, tonnes and kilograms). It uses a standard pea gravel density. Many builders and gardeners face the task of calculating or estimating the amount of gravel they would need to fill a given space or cover a ... Crushing News – crushed rock calculator cubic metre to ton …. 1 cubic meter of 1 inch crushed stone equals how many tonnes.Tons to Cubic Metre [Archive] – OnlineConversion Forums …ton (1 ton of fire wood equals to how many … »More detailed

Gravel Calculator - calculate how much gravel you need

Use this online gravel calculator to estimate how much gravel in volume (cubic ft, cubic yards, or cubic meters) or weight (tons & pounds, tonnes and kilograms). It uses a standard pea gravel density. Many builders and gardeners face the task of calculating or estimating the amount of gravel they would need to fill a given space or cover a ... 7. Divide the total load (Step #6) by the bench height. This will equal the number of cubic yards that can be broken at 1 lb/cy. 8. Determine approximate square pattern from Table 1 of Blaster's Guide, or multiply the number ob POWDER FACTOR 9. Adjust to a rectangular pattern of the same total cubic yards. 10. Adjust stemming and subdrilling ...

Calculating How Much Stone Dust You Need - The Spruce

If your number comes out as a fraction, and it probably will, round up. Stone dust, sand, and other base materials are usually sold in 0.5 cubic yard increments. So here you would round the 1.19 cubic yards to 1.5 cubic yards of sand or stone dust. It is better to have a little extra than to run short and have to pause your project to order more. The following conversion factors in cubic metres (m³) are used to convert the calculated volume into different volumetric units: cubic nanometre (cu nm) – 1 x 10-27 m³; cubic micrometre (cu µm) – 1 x 10-18 m³; cubic millimetre (cu mm) – 1 x 10-9 m³; cubic centimetre (cu cm) – 1 x 10-6 m³; millilitre (mL) – 1 …

Chapter 8 BLAST DESIGN

7. Divide the total load (Step #6) by the bench height. This will equal the number of cubic yards that can be broken at 1 lb/cy. 8. Determine approximate square pattern from Table 1 of Blaster's Guide, or multiply the number ob POWDER FACTOR 9. Adjust to a rectangular pattern of the same total cubic yards. 10. Adjust stemming and subdrilling ... A ton is equal to 2,000 pounds. To calculate the amount of aggregate you need for a project, make sure you know the length, width and depth in feet of your project. Multiply these three values to get the volume in cubic feet, divide it by 27 to get cubic yards and finally, multiply your result by 1.5 to get how many tonnes you'll need.

How to Calculate Cubic Meters - 5 steps

May 29, 2017· One cubic meter is 35.3 cubic feet. Therefore you should apply a rule of three. Thus, if 1 cubic meter equals 35.3 cubic feet, how many cubic meters will, for example, 67 cubic feet be? Multiply 35.5 by 1 and divide it by your cubic feet measurement: 35.3 x 1= 35.3, 67÷35.3 = 1.89 square feet. Calculate cubic meters from cubic yards. Blue metal crusher dust (volcanic basalt) - approximately 1.5 tonnes/cubic metre.